Nonwoven Line RFQ Checklist
A comprehensive framework for structuring your Request for Quotation.
Start a dry-laid nonwoven line RFQ with the product and material, then define the equipment and project responsibilities. For recycled fiber, include representative waste samples. Treat the supplied KSG layouts as process examples and request current approved specifications rather than copying conflicting catalogue tables.
Use source material without copying its uncertainties
Attach the relevant process example to your RFQ, but request a current equipment list and approved specification. Waste-opener capacities, trim-opener details, and pulverize-cutter identifiers require clarification before comparison.
| Ask for | Purpose |
|---|---|
| Material sample and agreed trial criteria | Check suitability for the intended reuse |
| Current model and configuration-specific specification | Resolve conflicting catalogue and website details |
| Process flow and scope boundaries | Identify included machines, connections, and site responsibilities |
Sources reviewed: FIBER_RECYCLING_CARDAROG_1790837152410.pdf, pp. 3–5 (publication date not stated); KSG_카다로그_2023.12.29일_1790837133001.pdf, pp. 59–61 (filename date December 29, 2023; publication date not established). The RFQ questions are buyer guidance based on unresolved differences, not additional machine specifications.
Product & Raw Material Specifications
Start with the product the line must make, not a copied machine specification. For textile waste, identify fiber composition, fabric construction, coatings, moisture, contamination, and intended reuse. Ask what trials are needed to determine suitability.
- Application and sample product, including photos or reference samples
- Fiber or polymer type, blend ratio, denier, staple length, and condition
- Target GSM range, finished and process width, thickness, and roll format
- Required throughput and quality criteria such as tensile, uniformity, or filtration performance
- Number of products and expected changeover frequency
Facility & Utility Constraints
Share a dimensioned site drawing and utility information early. The supplier needs to know what space, access, power, heat, air, water, ventilation, and material-handling resources are available before finalizing a layout.
- Building length, width, clear height, columns, doors, floor level, and load limits
- Incoming material, finished-goods, forklift, crane, and maintenance access
- Voltage, frequency, phases, available electrical capacity, and local standards
- Gas, steam, thermal oil, water, compressed air, drainage, and exhaust availability
- Ambient conditions, dust controls, noise limits, and applicable safety requirements
Required Deliverables from the Supplier
Ask every supplier for the same documents and commercial breakdown. This makes technical differences, exclusions, and assumptions visible before negotiations focus only on the total price.
The RFQ should state who is responsible for every interface. Cabling, ducting, platforms, piping, local labor, lifting, utilities, civil works, and production materials are common sources of scope gaps.
- Process flow, preliminary layout, machine list, and supply boundary
- Capacity assumptions and utility-consumption estimate
- Current model-specific specification, main component list, and control-system architecture
- Price breakdown, exclusions, payment terms, shipping basis, and quotation validity
- Documentation list, spare parts, manuals, drawings, and software backups
Lifecycle & Commissioning Questions
Define how the line will be installed, started, tested, and handed over. Ask for proposed acceptance criteria and project responsibilities rather than relying on general statements about turnkey delivery or support.
- Project schedule assumptions and buyer decision deadlines
- Factory acceptance, site acceptance, and production trial criteria
- Commissioning team, local support needs, and working language
- Operator and maintenance training deliverables
- Warranty terms, exclusions, support channel, response process, and spare-parts lead times
By standardizing RFQ requirements, buyers can compare technical assumptions, scope boundaries, and project responsibilities on a more consistent basis.
Related Resources
Ready to define your project requirements?
Send the information you already have. KSG can then clarify the equipment scope, open questions, and information needed for a meaningful quotation.
